BABA compliance software for infrastructure contractors and engineers

Most teams still track Build America, Buy America in a spreadsheet and a folder of PDFs. SubmittalForge checks each item against 2 CFR Part 184 as submittals arrive and keeps the evidence attached.

The three tests

Every item falls into one category, and each has its own rule

2 CFR 184.3

Iron & steel products

Products that are more than 50% iron or steel by cost. Every manufacturing process, from initial melting through coating, must occur in the U.S. SubmittalForge traces each heat number from the bill of lading to its mill test report and letter.

2 CFR 184.3, 184.5

Manufactured products

Manufactured in the U.S. with more than 55% of component cost domestic. The calculation is done in code from the component costs you enter, and items that fail are flagged for the waiver ledger.

2 CFR 184.6

Construction materials

Eight listed material types, each with specific processes that must happen in the U.S. Pick the material and SubmittalForge shows the processes that apply.

Construction materials

The eight listed materials

Each has its own definition of where manufacturing happens. SubmittalForge asks only the questions that apply to the material you pick.

  • Non-ferrous metals

    2 CFR 184.6(a)(1)

  • Plastic and polymer-based products

    2 CFR 184.6(a)(2)

  • Glass (including optic glass)

    2 CFR 184.6(a)(3)

  • Fiber optic cable (including drop cable)

    2 CFR 184.6(a)(4)

  • Optical fiber

    2 CFR 184.6(a)(5)

  • Lumber

    2 CFR 184.6(a)(6)

  • Drywall

    2 CFR 184.6(a)(7)

  • Engineered wood

    2 CFR 184.6(a)(8)

Workflow

What changes for your team

Log built for BABA

Category, compliance status, waiver status and supporting documents for every submittal, in the columns state programs ask for.

De minimis in view

A running total of non-compliant cost against your agency's waiver cap, updated as items are flagged.

Audit-ready by default

Letters, MTRs and review stamps stay linked to the item, ready for pay-application reviews and closeout.

Programs and agency rules

2 CFR Part 184 covers federal financial assistance for infrastructure, including EPA State Revolving Fund, NTIA BEAD, DOE, HUD and USDA projects. FHWA and FTA keep their own Buy America regulations with different thresholds; for example, FHWA's manufactured-products rule phases in a 55% domestic-content test for projects obligated on or after October 1, 2026. Check the terms of your award.

Check an iron or steel mill test report