How SubmittalForge works

The path from a project to a stamped submittal, and what the cross-check does and doesn't decide.

SubmittalForge pre-checks steel submittals on federally funded construction before they reach the engineer of record. It compares the documents in a submittal against each other, against the ASTM grade the spec calls for, and against the Buy America rules for the project's funding agency.

The basic workflow

  1. Create a project for each federally funded job.The funding agency you pick decides which Buy America rules and waiver allowances apply.
  2. Add a submittal for each package you receive.By hand, by scanning the packet PDF, or by importing your Procore or ACC submittal log with its attached documents.
  3. Attach the documents the check reads.Mill test reports, the bill of lading, the manufacturer's BABA letter and the spec requirement.
  4. Read the cross-check.Each submittal gets a packet score and a list of findings, with a suggested stamp.
  5. Stamp it: No exceptions taken, Make corrections noted, or Revise and resubmit, signed with your name.Every stamp is written to the project's activity log.
  6. Return it with the Stamped PDF: a review sheet, then the documents with your stamp on them.GC & Engineer plan, or free for anyone a GC & Engineer subscriber shares the project with.
  7. Export the audit binder when you need a record for the agency or the owner.GC & Engineer plan.

What the cross-check compares

  • Bill of lading ↔ MTR: every heat number stamped on delivered pieces has a mill test report.
  • MTR ↔ BABA letter: the heats on the mill certs match the heats the manufacturer certified.
  • MTR ↔ spec section: chemistry and mechanical values meet the required ASTM grade, plus Charpy and galvanizing requirements.
  • BABA letter ↔ contract: the letter names the right contract and says which Buy America requirement it certifies.

What it doesn't do

SubmittalForge is a pre-check. It does not provide engineering services or legal advice and does not decide compliance. The engineer of record, the contracting officer and the awarding agency do. Check every result against the source documents and the agency's current requirements. See the Terms of Use.

Your part in it

Each role has a short guide: general contractors, engineers of record, subcontractors and fabricators, and agency and owner's reviewers.

Try it without an account

The sample workbench shows a full project review with fictional data; choose a role under Viewing as to see it as the general contractor, the engineer of record, a subcontractor or an agency auditor. The mill test report validator checks one mill cert for free.

Still stuck? Email support@submittalforge.com with your organization name and what you were trying to do.