Skip to content
SubmittalForge

Start here

Guide for subcontractors and fabricators

Check your mill certs, draft the BABA letter and fix what's flagged before you send a packet, so it isn't returned.

A packet that comes back Revise and resubmit costs you a review cycle. Check it the way the contractor and engineer will, before you send it.

Without an account

  1. Check each mill cert with the free MTR validator: chemistry, tensile results, carbon equivalent and where the steel was melted and poured.
  2. Draft the BABA letter with the free generator. Start from a mill cert fills in the heat numbers and the mill for you.

On a contractor's project

  1. When a contractor shares a project with you as Submits documents, sign in with the address they used. It appears under Shared with you.
  2. Add your submittals and attach the documents: mill certs, the bill of lading and the BABA letter.
  3. Read the cross-check and fix every error before the contractor reviews it. You'll see their stamp and comments when they return it.

Across many jobs

  • Subcontractor Pro adds packet scanning (up to 150 pages), unlimited BABA letters and a cert library you reuse across contractors. One job only? Buy a project pass.
  • Scanning a packet on a contractor's project uses your own plan.
  • The company that made or supplied the product signs the BABA letter. Only certify what you can document.
Still stuck? Email support@submittalforge.com with your organization name and what you were trying to do.