Skip to content
SubmittalForge

Try SubmittalForge on a sample project

SubmittalForge checks steel submittals on federally funded jobs before the engineer of record reviews them: each mill cert against its ASTM grade, every delivered heat against a mill cert, and the BABA letter against the contract. Pick a submittal below, read its cross-check and try a stamp. Nothing here is saved.

Metro Clean Water SRF Plant

Sample project

EPA-SRF-2026-4410 · EPA Clean Water SRF · 2 CFR Part 184

Submittals
3
0 stamped
Ready for engineer
1
All cross-checks pass
Flagged before review
2
Caught at gate 1
Waiver allowance · EPA SRF
EPA de minimis waiver20.1%

$181,000 of $900,000 used

You're the general contractor. Every packet is cross-checked as it arrives: send the clean ones to the engineer and return the flagged ones before anyone spends review time on them. Sample project; nothing is saved.

#05-1200-01 · 05 12 00 — Structural Steel Framing

Wide-Flange Structural Columns (W14x90) + Certified MTRs

Apex Structural Steel Fabricators · Spec requires ASTM A992 · BOL BOL-8841-A

Packet score
100/100

All cross-checks pass. Ready for engineer review.

Suggested stamp: No exceptions taken

  • BOL Heat #B894120 Matched to Attached MTR

    Delivery ticket Heat #B894120 is backed by Delta River Steel (sample) MTR.

    BOL <-> MTR Traceability

    Bill of lading ↔ MTR
  • Project-Specific Contract Number Verified on BABA Letter

    BABA letter explicitly cites Contract #EPA-SRF-2026-4410 and names Marcus Vance, P.E. as signer.

    Agency certification guidance

    BABA letter ↔ contract

Run this on your own project: create a free account and add your first submittal.

Start a project