Spec requirements and the cert library

Set spec section requirements

Record the required grade, Charpy and galvanizing for each spec section, by hand or by reading the section PDF.

Adding by hand: every plan. Reading a spec PDF: GC & Engineer

Requirements saved here feed the MTR ↔ spec section cross-check. Save one per spec section, then pick it on each submittal.

Add by hand

  1. Open the project and click the Spec requirements tab.
  2. Click Add by hand.
  3. Enter the CSI section and Title, choose the Required grade, and enter Min CVN (ft-lb) if Charpy testing is required.
  4. Tick Buy America applies, Charpy required and Galvanizing required as the spec says.
  5. Click Save. Drafts marked Not saved aren't used until you save them.

Read a spec section PDF (GC & Engineer)

  1. Click Read a spec section PDF and choose the section file.
  2. Each requirement found appears as a draft, with the sentence it came from.If the spec names a grade SubmittalForge doesn't check, the field shows Spec says: …. Pick the closest supported grade or leave it for manual review.
  3. Check every field against the spec, then Save or Discard each draft.

Use it on a submittal

  1. Open a submittal's Documents → Spec requirement tab.
  2. Choose it under Use a saved requirement, then Save.