GC & Engineer
The Waiver allowance card on each project shows the general waivers the funding agency allows, such as EPA's 5% de minimis waiver or FHWA's iron and steel minimal-use threshold, and how much of each is used.
Set it up
- Open Project settings and enter the cost bases the agency uses.
- On each submittal, open Documents and set the Material cost (USD) and Buy America category.The ledger counts the cost of submittals whose mill certs don't show U.S. melt and pour.
Read it
- Each bar shows the share of an allowance used. It turns amber above 60% and red above 85% or once it's exceeded.
- Enter the … to size this allowance means a cost basis is missing in Project settings.
- terms unconfirmed marks allowances whose terms we haven't confirmed against the agency's current guidance.
- If items fall outside every waiver, the card says so. Those need a project-specific waiver under 2 CFR 184.7 or replacement material.
- Everyone a GC & Engineer subscriber shares the project with sees the ledger there too, whatever their own plan: the agency auditor, the owner's representative, the engineer of record.
Waivers are granted by the agency, not by SubmittalForge. Use the ledger to see where you stand, then confirm with your contracting officer.